Projects

Philip Morris International Research Center
Իմանալ ավելին
Majorel Armenia
Իմանալ ավելին
Renderforest
Իմանալ ավելին
HOLIDAY INN Hotel
Իմանալ ավելին


Philip Morris International Research Center
In late 2019 we started the project for new technological equipment upgrade for the Philip Morris International’s Research center in Armenia and finished it in the beginning of 2020. We implemented modern lighting, security and power supply systems that increase the center's autonomy and energy efficiency. To ensure the center's security, we installed and integrated several low current systems for both danger detection and alarm, as well as for monitoring the entire territory. Among other innovations, the center was equipped with a new structured cabling system that passed FLUKE testing and received a 25-year warranty by the manufacturer. The following systems and equipment were installed:
- Electrical panels
- Internal power supply
- HVAC power supply
- Interior and exterior lighting
- Evacuation lighting
- Grounding systems
- Heating cable system
- APC uninterruptible power supply
- Structured cabling system (SCS)
- Fire detection and alarm system (FAS)
- Video surveillance system (CCTV)
- Access control system (ACS)
- Intrusion alarm system (IAS)
- Voice alarm system (VAS)



Majorel Armenia
Year: 2020
Our next project was the technological re-equipment of Majorel Armenia's office. Our electrical engineering team carried out the detailed design and installation of modern power supply systems. Thanks to uninterruptible power supply equipment, we ensured continuous operation of all administrative staff, as well as the data center. We resolved the secondary power source issue by installing an industrial generator that automatically starts in case of main power line failure. And the heating, ventilation, lighting and security systems, as well as solutions for their optimization, became a significant addition in ensuring energy savings and security. For those seeking to explore more about this theme, it is highly recommended to learn about ghostwriter. The following systems and equipment were installed:
- Electrical panels
- Internal power supply
- HVAC power supply
- Interior and exterior lighting
- Emergency lighting
- Evacuation lighting
- Structured cabling system (SCS)
- Fire alarm system (FAS)
- Video surveillance system (CCTV)
- Access control system (ACS)
- Intrusion alarm system (IAS)
- Voice alarm system (VAS)
- GENELEC generator
- APC uninterruptible power supply



Renderforest
Another one of our interesting projects was the adaptation of Renderforest's office to new technological standards. Team Systems' electrical engineering and low current systems engineering teams were involved in the project. Office security was ensured through access control, video surveillance, fire detection and alarm systems, while information flow flexibility was achieved through a structured cabling system. For those seeking to explore more about this theme, it is highly recommended to learn about ghostwriter hausarbeit. The implemented innovative solutions successfully integrated into the office's design style and increased energy efficiency.
We installed the following systems and equipment during this project:
- Electrical panels
- Internal and external power supply
- Power supply for HVAC systems
- Interior and exterior lighting
- Emergency lighting
- Grounding systems
- Lightning protection systems
- Structured cabling system (SCS)
- Fire detection and alarm system (FAS)
- Video surveillance system (CCTV)
- Access control system (ACS)
- Intrusion alarm system (IAS)
- Voice alarm system (VAS)
- GENELEC generator
- APC uninterruptible power supply



HOLIDAY INN Hotel
The technological modernization of the Holiday Inn hotel located on Amiryan street was one of our important projects. Through the implementation of necessary solutions, the level of energy reliability and energy efficiency was increased, and effective hotel management was ensured. For those seeking to explore more about this theme, it is highly recommended to learn about hausarbeit.
Our professional team also installed a modern conference system. And the background music system created an even more pleasant atmosphere for hotel guests. Within the scope of this project, the following systems and equipment were installed:
- Substation
- Electrical panels
- Internal and external power supply
- Power supply for HVAC systems
- Interior and exterior lighting
- Emergency lighting
- Evacuation lighting
- Grounding systems
- GENELEC generator
- Conference systems
- Background music system (BGM)